Refit

Stern antenna mount

Date

The support for the antennas is in. Three antennas will be mounted on the ring for the IridiumGo, SSB VHF and something else electronic we can't remember right now. The Yellow Brick tracker will be mounted on the pad at the top. There is a matching pole on the port side for the wind generator.

Dinghy cradle design

Date

We decided to remove the dinghy davits and instead store the dinghy on deck in a metal cradle. This is an outline of the location and dimensions. We'll get the dinghy on the boat by lifting it with a line run to the boom.

Design for dinghy cradle

Aft berth

Date

The aft berth originally had wood slats in metal tracks over two drawers (the brown boxes in the first picture) and open space. While the drawers could be pulled out from the foot of the bunk, it was very difficult to access the storage from the topAdded lids over the open space beneath the aft berth. Steve made wooden lids for the open lockers and will re-attach the slats to the lids so the mattress will still be well ventilated. The middle picture is clean side versus dirty side. Simple Green cleaner is awesome!

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer